Ship to Ship transfer
Operation involves mooring alongside two different or same sized ships for cargo transfer. During this operation, either one of the ships is at anchor or both are underway.
The mooring arrangement depends on the size of the ships. A vessel either at anchor or stopped and maintaining a constant heading is approached by the manoeuvring ship at an angle of approach as smaller as practicable. The region of approach is usually abaft the beam of the constant heading ship.
During the approach as the manoeuvring ship comes closer, it steers a course parallel to the heading or course of the other ship and reduces the horizontal distance between ships to less than 100 metres. Once this state is achieved the manoeuvring ship uses engine and rudder movements and reduces this distance further until the fenders touch each other.
The two ships thus then make parallel contact and the lines are passed respectively as per the mooring plan. As a common practice during the approach, the wind and sea are preferred to be from ahead or at very small angles to the bow.
Single buoy or single point mooring
Often larger ships that cannot approach ports and terminals are berthed outside the port limits or in sheltered anchorages and the cargo transfer carried out with the help of Single-point or single buoy moorings.
The basic principle of the buoy is to keep the position of the vessel with respect to the buoy steady and at the same time allowing vessels to swing to wind and sea..
Often a tug is provided at the aft to keep the ship at a fixed angle and distance from the buoy. The buoy is fixed by positioning it in the centre of four anchors connected to it. The ship is made fast to the buoy with the help of a single chain or two which is secured onboard to the bow stopper.
Conventional buoy or multi buoy mooring
In this method, the bow of the ship is secured using both her anchors whereas the stern is secured to buoy around it. In the approach firstly vessel approaches the final berthing position from forward at an angle of 90 degrees to her final direction of berthing.
The starboard anchor is then let go first at a pre-decided spot while the ship is making headway. The required amount of cable is paid and the astern propulsion too operated simultaneously to stop the vessel. Once the vessel is stopped in the water port anchor is let go and thus vessel positions her stern along the centerline bifurcating the buoys.
For aligning the vessel along this centerline port cable is paid out and starboard cable heaved in with astern propulsion. The helm and engines are to be carefully used during this manoeuvre to ensure the stern is swinging clear of any of the buoys.
During unberthing, the anchor cables are heaved in to move the vessel forward and the weight is taken on windward lines while casting off other lines to prevent swinging of the stern into the other buoys. This manoeuvre requires skill and efficient operation of the ship’s crew as well as of the mooring equipment as often weight of the lines can be immense.
Mediterranean mooring
For this type of mooring, a pre-calculated position is determined and approached using engine movements. The bow initially is made to cant towards the berth and the starboard anchor is let go in that position.
After this, the engines are run astern and the port anchor is let go at the designated spot. The vessel falls astern and swings to starboard. Thus vessel is held by both the anchors as it approaches the quay. Stern lines are then passed. Moorings are kept tight by using the anchor cables.
The positioning of the vessel is such that mooring is completed with around four shackles on each anchor. Often tide is used to control the drift of the vessel towards the quay while positioning it by heaving or paying out on one of the anchors.
Running mooring
This manoeuvre takes a relatively short duration compared to the Mediterranean mooring and offers more control of the vessel. The vessel’s starboard anchor is let go at a position approximately four to five shackles from the final position of the bow and around 9 shackles paid out while moving ahead on engines.
Then as she falls astern with the tide the port anchor is let go and the starboard anchor is heaved onto five shackles. This method restricts the swinging room and reduces the load on the windlass.
Standing mooring
This is practised during crosswinds. As the vessel is stopped the port anchor is let go and with the tide around 9 shackles are paid out. The starboard anchor is let go and simultaneously port anchor heaved on.
Thus the port anchor is kept on 4 shackles being generally the flood anchor and starboard on five as it is the ebb anchor. This vessel takes longer duration and provides less control over the vessel. The load on the windlass is more as compared to running moor.